Forensic Risk Analytics

Providing absolute financial certainty for institutional investors through independent 5D shadow auditing and forensic budget oversight frameworks

Scenario Details

Sector: Residential Development (Mid-Rise)

Project Value: £12 Million

Stakeholders: Property Fund & Tier 1 Main Contractor

Contract Type: JCT Design & Build

Reltic Service: 4D Phasing & Forensic Risk Mitigation

Let’s Work Together for Development

Call us directly, submit a sample or email us!

Address Business
2220 Plymouth Rd #302
Hopkins, Minnesota(MN), 55305
Contact With Us
Call us: (234) 109-6666
Herringtonconsulting@gmail.com
Working Time
Mon - Sat: 8.00am - 18.00pm
Holiday : Closed

The context

De-risking constrained urban sites

The project involved a £12M residential block situated on a highly constrained urban site with zero on-site storage capacity. The contractor’s manual Gantt-chart schedule, while comprehensive on paper, failed to account for the dynamic spatial-temporal conflicts between crane movements, structural steel deliveries, and surrounding residential access.

With a 2-week delay on the critical path carrying a potential financial penalty of £150k in liquidated damages, the developer faced significant capital exposure. Traditional 2D planning was insufficient to visualise the logistical bottlenecks that would inevitably manifest once site mobilisation commenced, leaving the investment’s timeline at high risk.

The Reltic intervention

Spatial-temporal logic and 4D simulation

Reltic was commissioned to perform a Forensic Schedule Interrogation using advanced 4D Simulation. We didn’t just review the programme; we digitised the entire build sequence by linking the 3D geometry directly to the master construction schedule.

By visualising the “living” project, we performed a spatial-temporal audit that uncovered 48 critical logistical clashes that were invisible in the 2D plan. We interrogated the phasing logic and re-engineered the sequence to optimise site access and crane utilisation. This moved the project from reactive fire-fighting to proactive spatial governance, ensuring that every trade had the “clear air” required to perform on schedule.

Data & evidence

Logistical clash identification lifecycle

Data Analysis Chart

Analysis key

Month 03 | Peak Detection
The peak point where 4D simulation identified 48 invisible logistical and spatial clashes in the baseline schedule.
Month 04 | Sequence Optimisation
Reltic intervention resolved 70% of conflicts by re-engineering the spatial phasing and delivery windows.
Month 06 | Risk-Free Mobilisation
The project commenced on-site with zero logistical conflicts remaining on the critical path.

Commercial outcome

Schedule certainty and overhead protection

Our 4D interrogation provided the developer with a level of logistical insurance that traditional scheduling cannot offer:

Zero Logistical Downtime
Prevented 14 major on-site clashes that would have halted structural works and trade handovers.
Insurance Assurance
We provided the project’s insurers and stakeholders with digital evidence of robust risk management, ensuring smoother project financing and coverage.
Capital Security
The intervention avoided a projected 3-week delay, saving the developer approximately £90,000 in site overheads and liquidated damages.

Call to action

Is your schedule hiding invisible risks?

Don’t let logistical clashes erode your capital. Let Reltic simulate your project’s future and secure your timeline today.