Forensic Risk Analytics
Providing absolute financial certainty for institutional investors through independent 5D shadow auditing and forensic budget oversight frameworks
- Home Main
- Case Studies
- Forensic Risk Analytics
Scenario Details
Sector: Residential Development (Mid-Rise)
Project Value: £12 Million
Stakeholders: Property Fund & Tier 1 Main Contractor
Contract Type: JCT Design & Build
Reltic Service: 4D Phasing & Forensic Risk Mitigation
Let’s Work Together for Development
Call us directly, submit a sample or email us!
Address Business
Hopkins, Minnesota(MN), 55305
Contact With Us
Herringtonconsulting@gmail.com
Working Time
Holiday : Closed
The context
De-risking constrained urban sites
The project involved a £12M residential block situated on a highly constrained urban site with zero on-site storage capacity. The contractor’s manual Gantt-chart schedule, while comprehensive on paper, failed to account for the dynamic spatial-temporal conflicts between crane movements, structural steel deliveries, and surrounding residential access.
With a 2-week delay on the critical path carrying a potential financial penalty of £150k in liquidated damages, the developer faced significant capital exposure. Traditional 2D planning was insufficient to visualise the logistical bottlenecks that would inevitably manifest once site mobilisation commenced, leaving the investment’s timeline at high risk.
The Reltic intervention
Spatial-temporal logic and 4D simulation
Reltic was commissioned to perform a Forensic Schedule Interrogation using advanced 4D Simulation. We didn’t just review the programme; we digitised the entire build sequence by linking the 3D geometry directly to the master construction schedule.
By visualising the “living” project, we performed a spatial-temporal audit that uncovered 48 critical logistical clashes that were invisible in the 2D plan. We interrogated the phasing logic and re-engineered the sequence to optimise site access and crane utilisation. This moved the project from reactive fire-fighting to proactive spatial governance, ensuring that every trade had the “clear air” required to perform on schedule.
Data & evidence
Logistical clash identification lifecycle
Data Analysis Chart
Analysis key
Month 03 | Peak Detection
Month 04 | Sequence Optimisation
Month 06 | Risk-Free Mobilisation
Commercial outcome
Schedule certainty and overhead protection
Our 4D interrogation provided the developer with a level of logistical insurance that traditional scheduling cannot offer:
Zero Logistical Downtime
Insurance Assurance
Capital Security
Call to action
Is your schedule hiding invisible risks?
Don’t let logistical clashes erode your capital. Let Reltic simulate your project’s future and secure your timeline today.