Strategic Change Advisory

Ensuring total margin stability and financial transparency for high-spec commercial refurbishments through forensic 5D cost modelling and adaptive change management frameworks

Scenario Details

Sector : Commercial Office Fit-out

Project Value: £4.5 Million

Location: Central London

Framework: JCT Design & Build

Service: 5D Commercial Modelling & Change Strategy

Let’s Work Together for Development

Call us directly, submit a sample or email us!

Address Business
2220 Plymouth Rd #302
Hopkins, Minnesota(MN), 55305
Contact With Us
Call us: (234) 109-6666
Herringtonconsulting@gmail.com
Working Time
Mon - Sat: 8.00am - 18.00pm
Holiday : Closed

The Context

The context: Navigating the “cost black hole” of 2D data

The project involved a high-spec office refurbishment in the heart of London, executed under a demanding fast-track programme. As the project moved into the critical second-fix stage, the developer was forced to initiate a series of rapid design iterations to accommodate evolving tenant requirements.

Traditional Quantity Surveying (QS) methodologies, reliant on static spreadsheets and periodic reporting, were unable to capture the granular impact of these shifts in real-time. This created a dangerous “cost black hole”- a period of financial opacity where the developer lacked visibility into how design tweaks were eroding the final profit margin. Without a data-led intervention, the project was trending towards significant budget drift, unverified contractor claims, and a total loss of commercial control.

The Reltic intervention

From reactive counting to predictive intelligence

Reltic was appointed to perform an exhaustive digital interrogation of the fragmented design data and re-establish commercial governance. We moved the project’s financial management away from reactive reporting toward predictive intelligence.

Our team reconstructed the project’s commercial DNA into a unified 5D Digital Twin. This went beyond simple cost estimation; we integrated the architectural intent directly with the live commercial model.

By “interrogating” the digital data, we established a framework where every proposed design change was automatically reconciled against the baseline budget. We visualised the financial impact of every nut, bolt, and partition change before the instruction was even issued on-site. This transformed the commercial department from a “record-keeping” function into a strategic decision-making hub, providing the developer with the evidence needed to challenge or approve variations with absolute confidence.

Data & evidence

Margin stability and risk mitigation analysis

Analysis key

Month 03 | Peak Exposure
Point of maximum financial opacity due to unverified design changes outpacing traditional 2D reporting.
Month 03 | Peak Exposure
Point of maximum financial opacity due to unverified design changes outpacing traditional 2D reporting.
Month 03 | Peak Exposure
Point of maximum financial opacity due to unverified design changes outpacing traditional 2D reporting.

Commercial outcome

Secured margins and absolute transparency

Our intervention fundamentally restructured the commercial health of the project, delivering a level of certainty that traditional methods could not provide:

Forensic financial control:
100% of project variations were costed, interrogated, and approved prior to site execution. This eliminated "end-of-project" disputes and ensured the Final Account was settled without surprises.
Significant margin recovery
Our 5D interrogation identified £180,000 in scope overlap - hidden costs where the contractor was inadvertently charging twice for integrated trade packages.
Live capital transparency:
The developer maintained a continuous, high-fidelity view of their projected final account. This provided institutional investors with the "Audit-Grade" reporting required for secure capital drawdown.

Call to action

Is your project margin at risk?

In a volatile market, guessing is not a strategy. Don’t wait for the final account to discover where your profit went. Let Reltic interrogate your project data and secure your investment today.